What to do on handover day: a new-build buyer's checklist
Updated: 6 days ago
Handover day is the day you finally get the keys to your new-build home. It's exciting, it's busy, and it's very easy to be rushed. After more than 20 years building new homes, I've stood on the other side of a lot of handovers. The buyers who got the best start were the ones who slowed down, asked questions and wrote things down.
Here's what I'd do on the day, in plain English.
Before the day: know what you're entitled to
If your builder is registered with the New Homes Quality Board, it must follow the New Homes Quality Code. Among other things, the Code says the builder should give you the chance to have a pre-completion inspection, either by yourself or by a suitably qualified inspector, after the notice to complete has been served and before the completion date.
The Code also says a home shouldn't legally complete unless it is a "complete new home". In simple terms, it should be finished and fit to live in, with only minor items such as decoration or putting right faults left to do.
So if you can, get your inspection done before handover. That way the snag list is already with the builder when you collect the keys.
Ask for the home demonstration
Under the Code, the builder should offer you a home demonstration, including how to use the appliances. Don't skip it, even if you're tired or the removal van is waiting. Ask the person showing you round to point out:
The stopcock (main water shut-off) and how to turn it off
The consumer unit (fuse box) and what each switch controls
The boiler or heat pump controls, and how to set the heating and hot water
The gas meter and emergency control valve, if you have gas
Any ventilation system (for example, extract fans or a whole-house system) and how it should be left running
Smoke and heat alarms, and how to test them
Window locks, trickle vents and any fire escape windows
Take a short video on your phone as they talk you through it. You'll be glad of it in January when the heating timer needs changing.
Collect the right paperwork
The Code lists information the builder should give you at completion. Check you have, or know when you'll get:
Your new home warranty cover note or certificate and the policy documents
Details of guarantees and warranties for the home and appliances
A schedule of any incomplete work, with timescales for finishing it
A clear written explanation of the after-sales service, including who to contact and how emergencies are handled
A copy of the builder's complaints procedure
The building regulations completion certificate, or a date for when it will be available
If your warranty is with NHBC, their moving-in guidance says you should get your insurance certificate and policy booklet through your conveyancer. Their advice is to contact your conveyancer if you haven't received them within four weeks of moving in.
Do a quick walk-round and take photos
Even if you've already had a full inspection, walk round once more on the day. Things can get damaged during final cleans and deliveries. Take dated photos of each room, especially:
Floors, worktops, doors and frames (scratches and chips)
Glass in windows and doors
Bath and shower trays (look for chips or cracks)
Outside: paving, fences, gates and the garden
Photos taken before your furniture arrives make it much easier to show the damage was there before you moved in.
Take meter readings
Photograph the electricity, gas (if fitted) and water meters with the readings clearly visible. Then contact the suppliers so you're only billed from the day you took over. It takes five minutes and can save a disagreement later.
Know how to report snags
For the first two years, your builder is responsible for putting right snags and defects through its after-sales service. If your builder follows the New Homes Quality Code, it should acknowledge issues as soon as possible and, in most cases, sort them within 30 days unless there's a significant reason for a delay.
Always report snags in writing (email is fine), keep a copy and include photos. Emergencies, such as a major leak or loss of heating in winter, should go through the builder's emergency contact straight away rather than being added to a snag list.
If things go wrong and the builder's complaints process doesn't fix it, the New Homes Ombudsman Service may be able to help.
My handover-day checklist
Book your pre-completion inspection before the completion date if you can
Do the home demonstration and video it
Find the stopcock, fuse box and heating controls
Check you have your warranty documents and after-sales details
Walk round and take dated photos of every room
Photograph all meter readings
Save the builder's after-sales and emergency contacts in your phone
Put any snags in writing, with photos
Want a second pair of eyes?
I'm an independent snagging inspector and I work for you, not the builder. My inspections follow the New Homes Quality Board checklist, include thermal imaging and drone roof photos, and you get a photo report by the next working day. Pre-completion inspections start from £295.
Grab my free new-build snagging checklist to use on the day, and if you'd like me to inspect your home, you can book an inspection on the Book Online page.



Comments