Post-move-in snagging: what to check in your first few weeks

Oct 28
2 min read

Updated: 6 days ago

Not everyone has a snagging inspection before completion. Completion dates move, and sometimes there just isn't time. The good news is that it's not too late. Your builder is usually responsible for putting right defects for the first two years, so a post-move-in inspection still gets snags fixed at the builder's cost.

Why check in the first few weeks?

  • Snags are easier to show were there from the start when you report them early, before furniture, everyday wear or your own changes get in the way.

  • Builders registered with the New Homes Quality Board should aim to fix reported snags within 30 days, so the sooner you report them, the sooner they're fixed.

  • One full list is easier for the builder to plan and harder to ignore than odd emails over several months.

What to check yourself

Inside

  • walls and ceilings in daylight, looking from an angle, for patchy paint and cracks

  • every door and window: does it open, close and lock properly?

  • sealant around baths, showers, sinks and worktops

  • tiles and grout, for cracks, gaps and uneven edges

  • taps, showers and radiators: run them, then look for drips underneath

  • sockets, switches, lights and extractor fans

Outside (from the ground only)

  • brickwork and mortar joints

  • gutters and downpipes when it rains

  • paths, drives and ground levels next to the walls

Please don't go up a ladder or onto the roof. A drone can photograph the roof and gutters safely.

What a professional inspection adds

A trained inspector knows where snags hide and checks things most buyers wouldn't think of, such as loft insulation, the fall on gutters, weep vents, socket wiring and drainage. Our post-move-in inspections follow the New Homes Quality Board checklist and include thermal imaging and drone photos of the roof. You get a photo report by the next working day, ready to send to your builder.

How to report snags to your builder

  • Send everything in writing, by email, with photos and dates.

  • Keep a copy of your report and every reply.

  • If the builder doesn't respond or you can't agree, use its complaints process. If it's registered with the New Homes Quality Board, you can then take your complaint to the New Homes Ombudsman, which is free, once you've had a final response or 56 days have passed since you first complained.

Book a post-move-in inspection

Prices start from £295 for a 1–2 bed home, with weekday and Saturday appointments. Use Book Online to pick a date.

Doing your own checks first? Get our free new-build snagging checklist, a one-page, room-by-room list you can print or use on your phone.

 
 
 